gate dam meaning in Chinese
闸坝
闸门式堰
Examples
- Our researches are focused on the basic treatment as anti - seepage style and related problems , as regards the anti - seepage measures of gate dam foundation , the combination measures of vertical anti - seepage and horizontal blanket anti - seepage are studied here
本文着重对防渗型式等基础处理进行了研究,对于闸基防渗措施,研究了垂直防渗与水平铺盖防渗相结合的措施。 - In this paper , by focusing on the treatment of gate dam foundation of futang power station under construction , and finally by the researches , contemplation and exploration made on the basic treatment of deep and thick overburden , we intent to use these results to offer some reference for the related projects
文中以在建的福堂水电站闸基基础处理为重点,对深厚覆盖层基础处理进行研究、思索和探导,以期达到抛砖引玉的目的,并为待(在)建工程起到一定的参考借鉴作用。 - The power station is diversion type power station of low gate dam with a normal storage level of 1268 . 0 m , a highest gate dam level of 31 meters and a reservoir capacity of 2 , 974 , 000 cubic meters , the length of diversion tunnel of which is 19 . 57 kilometers , installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden , the foundation of which mainly consist of five overburdens which , in general , belong to multiple , complex foundation
福堂水电站位于四川省阿坝藏族羌族自治州汶川县境内的岷江河段上,电站为低闸引水式开发。正常蓄水位1268 . 0m ,最大闸高31m ,库容297 . 4万m ~ 3 ,引水隧洞长19 . 57km ,装机360mw 。福堂水电站闸坝建于深厚覆盖层基础上,基础主要存在五大覆盖层,总体属于多层复杂地基。 - On the basis of comparison of different plan , calculation results of seepage of dam foundation and the calculation results of gate dam foundation settlement value and the integrated analysis of the calculation results of load supporting capacity , with additional reference to other project , the resolutions to the anti - seepage , anti - liquefaction and uneven sedimentation of foundation were put forward
基于基础处理各种方案的比较、闸坝基础渗流的i }算结果、闸坝基础沉降量的i一1算结果以及承载能力计算结果的综合分析,参考借鉴其它_二程的成果和计算分析成果,提出了综合解决闸坝基础防渗、抗液化和不均匀沉降等问题的处理方案,该方案在各种组合工况下主要建筑物的稳定、应力均能满足规程规范要求。